Office Relocation Timeline in NYC: Count Back From the Date That Matters
The office relocation timeline in New York has two honest totals. A team that decides quickly and takes a prebuilt floor can go from first tour to working desks in six to eight weeks. The same team building a custom office needs four to six months. Both totals are made of four phases: the search, the offer and letter of intent, the lease, and the buildout or move-in. If your date is fixed, such as a lease expiry, count back from it and start nine to twelve months ahead, so that no phase has to be rushed.
Rather have a broker answer it for your team?Tell us team size and timing. A broker reaches out within the hour during business hours.
Send move-in ready floorsUpdated 2026-10-03 · Nomad Group
Each phase of the timeline, with its length
- Search: two to four weeks with a clear brief of headcount, budget and neighborhoods.
- Offer and letter of intent: one to two weeks of proposals and counters, ending in a short signed document that fixes rent, term, free rent, allowance and security.
- Lease: three to six weeks of drafts passing between the two sides' attorneys, usually in two or three rounds.
- Buildout or move-in: two to four weeks on a furnished or prebuilt floor, 10 to 16 weeks for a custom buildout.
How long it takes to get an office describes what happens inside each phase.
Where the calendar slips, and what can overlap
The market is rarely the cause of a late move. The usual causes are on the tenant's side:
- Doing things in sequence: signing, then looking for a contractor, then learning what the permits need.
- Slow decisions, in a market where good floors are taken in days.
- Landmark approvals, which add two to four weeks in SoHo and parts of Flatiron.
- Long-lead items, such as glass partitions and switchgear, ordered late.
Overlap is the remedy. Design can start during the lease negotiation, permits can be filed on the day of signing, long-lead orders can be placed during legal review, and furniture can be chosen while walls go up. The buildout guide covers the construction clock.
Counting back from a lease expiry
Take the expiry date and work in reverse. Leave a safety month before it for handing back the old space in the condition that lease requires. Before that sits the buildout: 10 to 16 weeks custom, two to four prebuilt. Before that, the lease, then the offer, then the search.
Run with overlap, the whole chain fits inside a quarter on a prebuilt floor, six to eight weeks for a team that decides quickly, and in four to six months with construction. Start nine to twelve months out and nothing has to be rushed. Overstay the expiry with no signed extension and holdover rent applies, often one and a half to two times what you were paying.
Move week in a New York building
The last two weeks run on building rules, in both the building you are leaving and the one you are entering.
- Certificates of insurance for every vendor, worded as each building requires.
- Freight elevator and loading dock bookings. Many buildings allow moves only on evenings or weekends.
- The internet circuit, ordered when the lease is signed, since installation can take several weeks.
- Phones, printers, Wi-Fi and door badges switched over and tried out ahead of the first morning.
- A few weeks of rent on both spaces, so the move does not depend on everything going right.
- A walkthrough and photographs when the old floor is handed back.
Floors that shorten the calendar
The phase with the widest range is the last one, and a floor that is already built removes most of it. The live block below shows the furnished and prebuilt floors we list, the kind a team can usually occupy within two to four weeks of signing. If your date is close, start there. How fast a startup can move into a custom office covers the case where only a custom floor will do.
Furnished and prebuilt floors available now
Live from our listings · 6 of the 24, cheapest first24 floors we list are furnished or prebuilt, so a team can move in without running its own buildout. They run from 2,500 to 19,097 square feet, asking $44 to $135 per square foot per year.
- Floors
- 24
- Sizes
- 2,500-19,097 sq ft
- Asking rent
- $44-$135 / sq ft
- 237 West 27th Street, Entire 11th Floor 7,158 sq ft $44/sq ft Chelsea move-in ready
- 153 West 27th Street, Partial 11th Floor 2,937 sq ft $60/sq ft Chelsea furnished
- 6 Greene Street, Entire 2nd Floor 4,900 sq ft $78/sq ft SoHo furnished
- Empire State Building, Partial 43rd Floor 5,621 sq ft $90/sq ft NoMad prebuilt
- 50 Greene Street, 3rd Floor 7,300 sq ft $98/sq ft SoHo furnished, move-in ready
- 520 Broadway, Entire 10th Floor 5,539 sq ft $125/sq ft SoHo prebuilt, delivering Q1 2027
The full guide
This page is the short answer. The long one, with the numbers worked through, is here:
Related topics
- NYC Office Relocation for a Growing Startup: The Decisions, in Order
- Office Fit Out vs Refurbishment: What the Choice Changes for an NYC Tenant
- Office Tenant Buildout in NYC, Step by Step: Stages, Permits and Weeks
- Office Renovation for Manhattan Startups, Run by the Team That Did Your Lease
How many months should we allow for an office move with a custom buildout?
Four to six from the first tour to working desks, and nine to twelve of lead time before a lease expiry if you want room for error.
Which phase of a relocation is most often late?
The buildout, though the cause is usually earlier: design that started after signing, or long-lead items ordered after the permits.
When should the internet circuit for the new office be ordered?
As soon as the lease is signed. Installation lead times can run several weeks, and a circuit ordered when the walls go up is often not live on move day.
What if the old lease ends before the new office is ready?
Ask the current landlord for a short written extension well before the date. Without one you are in holdover from the first day, at a penalty rate. If no extension is offered, a furnished floor or a flexible arrangement can bridge the gap while the permanent office is finished.
Talk to a broker
Want this answered for your team?
Tell us three things: team size, timing, budget. A first shortlist can be ready within 24 hours, with the asking rent on every floor that publishes one.
- Within the houra broker reaches out during business hours, no automated triage
- On your sidewe work for you on your search, and the landlord usually pays our fee
- Open pricingasking rent published for 46 of 49 floors, size and address for all
- 300+ officesdelivered in New York, 2M+ sq ft leased
Or call 646-688-3158